Add Project Billing
- Navigate to the Billing page in the Supplier view.
 - In the top ribbon, click Add New.
 - In , select Suppliers.
 - In the section, select the supplier organization to create the billing for.
 - 
                In the Add New Billing : Requisition Selection, locate
                    the requisition and click Select in the right side of the
                    list.
                
Note:Selecting any of the other links (Req#, Requisition Type, and so on) navigates you away from the billing configuration. - In drop down, select Project.
 - Click Submit.
 - 
                In the detail list, configure your milestones, materials, or position billing
                    information. If an expense or custom field is required, ensure to complete
                    required fields.
                

- Milestone - Based on a flat fee defined in the project quote.
 - Material - based on a flat unit price for material cost defined in the project quote.
 - Position - Based on one or more positions defined in the project quote. The hourly rate is multiplied by total number of hours (units) entered for the position. You must select a defined position and the worker for that position when entering this billing type.
 
 - For each billing type, enter the date of the billing.
 - In the Billing Notes field, enter text for your note.
 - 
                Select Add New.
                This expands the section where you enter the billing item details.
 - 
                From the type drop down, select the billing item type.
                Note:Some items only have one defined type.
 - Enter the amount billed for.
 - 
                Optionally, if the billing has expenses, click Add New
                    in the Expenses section. Configure the following
                    fields:
                
- Type - Use the drop down to select the type.
 - Description - Enter a text description.
 - Amount - Enter the amount of the expense.
 
Note:The Balance Amount reflects any expenses added to a billing item. - 
                Optionally, if a project is using billing codes/allocations, enter then in the
                        Custom Fields section. You can add more than one
                    code/allocation to the billing.
                Note:Ensure that the Total Percentage for all entered codes/allocations equals 100.
 - Additionally, upload any required attachments by clicking Attachments at the bottom of the configuration screen.
 - Click Save.