SOW Change Order eSigning
Feature Overview
When a Project engagement is already Filled (an approved SOW is in place), users sometimes need to change it – milestones, materials, worker positions, end date, or scope. This feature makes every such change a formal SOW Change Order: the system generates a Change Order document from a configured template, sends it by Adobe Acrobat Sign to the required signers (MSP, Manager/Client, Supplier) in a configured order, and only finalizes the change once everyone has signed.
Value
A signed, auditable record of every post-award change; consistent signer order; and custom-field data (requisition, supplier, worker) included in the document automatically.
Target Users
- MSP administrators – configuration
- MSP users and Managers – submitting changes
- Suppliers and Managers – signing
Step-by-Step Guide
Prerequisites Checklist
A Change Order is generated only if all of the following are true. Otherwise, the quote is submitted without a Change Order (silently skipped).
- Allow eSigning of Documents is enabled at the Country level.
- The Change Order template is built and selected.
- Go to and save the template.
- At least one signer (MSP, Manager, or Supplier) is switched on.
- Go to , and select an existing workflow or create a new one.
- In the SOW Change Order section:
- Select the Change Order Template.
- Switch on Allow eSigning of SOW Change Order Contracts.
- Switch on the required signers (MSP, Manager, Supplier). Drag the signers to set the signing order. Click Save Changes.
- The request type is Project.
- Create the SOW project request, enter all mandatory details, select the SOW workflow/template, and submit the SOW request.
- The engagement created and engagement status should be Filled before initiating a Change Order.
- On the Quotes tab, modify the milestones, materials, or end date, or add worker positions, and then click Save and Submit all.
- The Change Order flow is initiated and the engagement is in the Filled– Changes Pending state.